Hopp til hovedinnhold

BIM

Model-based engineering allows the suppression system to be seen in the context of other disciplines — early enough for conflicts to be resolved before they reach the construction site.

What BIM integration provides

In suppression projects, we use BIM to ensure coherence and documentation:

  • Model-based engineering of the suppression system
  • Multi-disciplinary review and clash detection
  • Better basis for execution and handover
  • Traceable documentation throughout the project

Part of a combined delivery

BIM is a tool in the needs-based delivery — not an end in itself. It supports engineering, inspection and commissioning.

Talk to us about BIM in suppression projects

Contacts

Thorsteinn Petursson

Thorsteinn Petursson

CTO / Fire Suppression Systems Lead

Vi bruker informasjonskapsler for å forbedre nettstedet og analysere trafikk. Du kan velge hvilke kategorier du godtar. Personvernerklæring