BIM
Model-based engineering allows the suppression system to be seen in the context of other disciplines — early enough for conflicts to be resolved before they reach the construction site.

What BIM integration provides
In suppression projects, we use BIM to ensure coherence and documentation:
- Model-based engineering of the suppression system
- Multi-disciplinary review and clash detection
- Better basis for execution and handover
- Traceable documentation throughout the project
Part of a combined delivery
BIM is a tool in the needs-based delivery — not an end in itself. It supports engineering, inspection and commissioning.